Quick Links >>>

 Home      |        Partner Area  



Join EuroSITES mailing list

Join the EuroSITES
mailing list

ESTOC

February 2010
The observatories deployed at the ESTOC site have unfortunately suffered communication failure in early 2009. The mooring was recovered in January 2010, and attempts are being made to download the delayed-mode data. It is planned to deploy the new mooring in early March and prior to that the full system will be tested in Taliarte bay, close to ICCM.

The ESTOC team have produced tables summarising the sampling carried out at the ESTOC site since from 1994 upto 2008, which can be downloaded as a pdf HERE and a document briefly describing the sampling and analysis methods downloadable HERE.

Below is a set of graphs of the raw data collected while the satellite link was working in 2009.
Click to view larger image


The site continues to be visited regularly and CTDs and other samples taken. Graphs plotted from data collected earlier this year are shown below.

Temperature


Salinity


Initial Analysis of seasonal sampling data 2009


Diagram showing the planned mooring.


Click to view large size

 

Spring 2008
The DOLAN buoy which had been used as a platform at the ESTOC site in the ANIMATE network was redeployed to another site in April 2008, at the end of the MERSEA project. ICCM are currently testing a new buoy, and plan to deploy an observatory in Spring 2009.

The link(s) below will take you to the sites serving the data already collected.

ESTOC ANIMATE ftp directory

 

Diagrams showing the mooring deployed in December 2008.

Table showing sensors deployed in December 2008.







This pdf in Spanish and English summarises the range of observations made at ESTOC 1994 to 2009

A pdf in Spanish and English of a EuroSITES information sheet

 

If you use EuroSITES data in publications please acknowledge the EuroSITES Project . Also, we would appreciate receiving a preprint and/or reprint of publications utilizing these data for inclusion in the EuroSITES bibliography. These publications should be sent to:
  EuroSITES Data Manager
National Oceanography Centre, Southampton
Waterfront Campus, European Way
Southampton SO14 3ZH
UK
 

 


EC flag

EuroSITES is a FP7 Collaborative Project coordinated by the
National Oceanography Centre, Southampton, UK
 

Call FP7-ENV-2007-1, grant agreement N° 202955
Sub-Activity 6.4.1. Earth Observation; Monitoring the ocean interior, seafloor, and subseafloor

7 framework logo